Operational results 2009
Work performed 2009
2009.
- 
- 
- 
- November.
- 
- 3 orders for wind tunnel test models from JAXA
- Inverted fan model (optical modelling)
- Motorised simulator models (light modelling + aluminium alloy)
- Leg model (high intensity light modelling)
 
 
- 3 orders for wind tunnel test models from JAXA
 
- 
- November.
- 
- 1 order for a wind tunnel test model from Shimizu Corporation.
 Dome-shaped architectural model    
 
- 1 order for a wind tunnel test model from Shimizu Corporation.
 
- 
- November.
- 
- US office opened (San Jose).
 
 
- 
- Oct.
- 
- Order from JAXA for aircraft leg models for wind tunnel testing.
 
 
- 
- September.
- 
- Decision to enter the US after JETRO review.
 
 
- 
- July.
- 
- Request from JAXA to consider future wind tunnel test facilities.
 
 
- 
- May.
- 
-  1 order for a wind tunnel test model from Shimizu Corporation Technical Research Institute.
 Temple-type multi-point pressure measurement model (400 ports)    
 
-  1 order for a wind tunnel test model from Shimizu Corporation Technical Research Institute.
 
 
- 
 
- 
 
					         
                           English (UK)
English (UK)				 日本語
日本語					           Deutsch
Deutsch					           Français
Français					           Italiano
Italiano