Operational results 2009
Work performed 2009
2009.
-
-
-
- November.
-
- 3 orders for wind tunnel test models from JAXA
- Inverted fan model (optical modelling)
- Motorised simulator models (light modelling + aluminium alloy)
- Leg model (high intensity light modelling)
- 3 orders for wind tunnel test models from JAXA
-
- November.
-
- 1 order for a wind tunnel test model from Shimizu Corporation.
Dome-shaped architectural model
- 1 order for a wind tunnel test model from Shimizu Corporation.
-
- November.
-
- US office opened (San Jose).
-
- Oct.
-
- Order from JAXA for aircraft leg models for wind tunnel testing.
-
- September.
-
- Decision to enter the US after JETRO review.
-
- July.
-
- Request from JAXA to consider future wind tunnel test facilities.
-
- May.
-
- 1 order for a wind tunnel test model from Shimizu Corporation Technical Research Institute.
Temple-type multi-point pressure measurement model (400 ports)
- 1 order for a wind tunnel test model from Shimizu Corporation Technical Research Institute.
-
-